At blocked highway 331 (Rayong-Sa Kaew), There is protesting of 600 villagerses. They resist building a coal-fueled electricity generation plant that be fuel produces the electricity of a province no. 304. Villagers call for the National Power Supply Company Limited, the project's owne, move this planned power plant to elsewhere, because industry province that get surrounded with agriculture large-sized community of the country and located on near the Khao Hin Sawn Education and Development Centre, a development project initiated by His Majesty the King. They worry about the electric power station will destroy the environment and makes trouble the health that affect villagers like that happen in Mae Moh of Lampang and Map Ta Phut of Rayong were experiencing now. The environmental impact assessment report of the 540-megawatt power plant was approved in late 2009. The project operator planned to build the plant inside the No304 industrial estate of the eastern province.
I think, They plan to established a coal-fueled electricity plant in Mae Moh, Lampang and Map Ta Phut, Rayong but a native people are resistant to a plant because it make a bad pollution and a bad environment. People who live at there will obtain a disease from a coal. They will have a terrible health. However, the coal-fueled electricity plant has benefit a lot. It can make a lot of electric from the plant to the house of people.
Vocabulary Analysis Results
AWL ENTIRE ANALYSIS
Text wordcount = 232
Frequency of list words detected = 17
Rounded Coverage = 7%
Words found
assessment = (1)
benefit = (1)
environment = (2)
environmental = (1)
established = (1)
affect = (1)
community = (1)
impact = (1)
obtain = (1)
located = (1)
project = (3)
generation = (1)
estate = (1)
initiated = (1)
OXFORD 3000 ANALYSIS
Text wordcount = 232
Frequency of list words detected = 178
Rounded Coverage = 77%
http://www.bangkokpost.com/feature/environment/188475/villagers-oppose-coal-fired-power-plant
No comments:
Post a Comment